Walk through access before the start date

Identify driveways, narrow paths, locked gates and any areas that must remain available to occupants. Tell the painter about delivery times, school routines or shared access. Access equipment needs its own assessment; homeowners should not improvise platforms or arrange removal of fittings without discussing the work first.

Allocate moving and protection responsibilities

List outdoor furniture, pot plants, wall-mounted items and vehicles near the work. Confirm who moves or protects each item and when it can be returned. Discuss delicate planting and adjoining finishes. Do not assume the painting scope includes disconnecting electrical fixtures, removing services or relocating heavy equipment.

Agree a practical daily handover

Ask how tools, materials and work areas will be left between visits and which routes will stay usable. Keep children and pets away from active work areas. Confirm how weather-related changes will be communicated and which items must remain clear until coatings are ready for normal contact. Agree where materials can be stored without blocking the household's normal entry and exit.

Frequently asked questions

Should I move everything before the painters arrive?

Agree a preparation list first. Move only the items assigned to you and leave specialist or unsafe work to appropriately qualified people.

Planning your Colourway project

For residential interiors, our online tool gives you an initial estimate from the rooms and surfaces selected. Exterior, commercial and strata work is assessed on site so access, preparation and the correct coating system can be confirmed before fixed pricing.